![](http://www.hansonphotodesign.com/img/s12/v176/p953265247-2.jpg)
Getting started by hauling in the pre-bent boards. |
![](http://www.hansonphotodesign.com/img/s7/v167/p691361799-2.jpg)
Lots of hands are required to get the boards lined up. |
![](http://www.hansonphotodesign.com/img/s12/v177/p613781253-2.jpg)
After four layers are in place they are fixed with deck screws. Necessary to free up clamps for the next board. |
|
![](http://www.hansonphotodesign.com/img/s6/v137/p627225098-2.jpg)
Bexter applying additional wood preservative. Resawing the 2x4s exposed the untreated core of the board so additional treatment was required. We used Woodlife Coppercoat (copper napthenate) brush on preservative. |
![](http://www.hansonphotodesign.com/img/s12/v180/p881226379-2.jpg)
Jordan getting the hard to reach areas. |
![](http://www.hansonphotodesign.com/img/s7/v161/p863064228-2.jpg)
The glue station. |
![](http://www.hansonphotodesign.com/img/s6/v142/p991439369-2.jpg)
The correct number of clamps is n+1. |
![](http://www.hansonphotodesign.com/img/s7/v157/p798704742-2.jpg)
Setting the last few boards on the ground berm to the proper radius. |
![](http://www.hansonphotodesign.com/img/s7/v164/p787898762-2.jpg)
Final progress on the ground berm from today. |
![](http://www.hansonphotodesign.com/img/s6/v141/p113080617-2.jpg) 6000 lbs of white oak decking delivered. This pile weights more than the car parked behind it. |
|