Dave and the Westbrook crew began clearing the 203 loop last weekend and are now in need of volunteers to knock out the dirtwork. If you can lend a hand Sunday December 4th they are meeting at 9:00 am behind P&K Implement at the end of the gravel road (view exact location here). This loop travels through some undulating terrain and will feature a lot of twists and turns with minimal elevation change. Loop distance is expected to be 0.7 miles and will push the system total over the 6 mile mark.
Flat shovels and rogue hoes will be required. A few extras will be available if you don't have your own. Sharpen those edges for easier digging. If you have a pair of bolt cutters or heavy duty wire cutters bring them along. There is an old barbed wire fence line that runs along a section of trail that we need to clear out.
Never helped out at a trail build day before? Check out this guide on how to prepare.