Planning on working again this weekend (4/11-4/12) on the berm projects. Meet at 9:30 am in the upper south side parking lot near the salt dome. Right now, I plan to be out both days but this will depend on how much we get done Saturday.

To Do List (Required Tools):

  • Bench ~150' of new trail and build a few retaining walls (rogue hoes, flat shovels, post hole digger, wheelbarrow)
  • Attach decking to elevated berm. (impact drivers, I have plenty of T25 bits)
  • Rehab old trail (rogue hoes)
  • Blow leaves off of trails to promote faster drying after rain (leaf blowers and fuel)
  • General trail trimming/maintenance (hand lopper, pruning saw, rogue hoe)
  • Extracting leftover wood pile. (wheelbarrow, strong back, and I'll have the trail cart)
  • Haul in gravel for drainage features. (wheelbarrow, shovel)


I'll be bringing: chainsaw & PPE, trail cart, 5 rogue hoes, 3 flat shovels, backpack leaf blower & extra fuel.

Post up if you plan on coming so I can get an idea of which projects we can finish.

We may also be out during the week to do a few things. I'll be posting the weeknight announcements through the IFP Trailwork mailing list. Click here to find out how to subscribe to the list.