Results 1 to 7 of 7

Thread: Berm Project Work: Sat. (4/11) & Sun. (4/12) @ 9:30 am

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,852

    Default

    John and the Browns took care of the leaf blowing this week. Doesn't look like we are going to be out in the evenings this week but next week that may be the case. All effort has been going into bending planks for the large structure. A string of boiler failures has set us back a bit (she's old, tired, and leaky) but I should have the replacement up and running today.
    Last edited by DH001; 04-09-2015 at 10:10 AM.

Similar Threads

  1. Working on Berm Structures - Weeknights, Sat. 4/4, & Sun. 4/5
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 1
    Last Post: 03-31-2015, 10:33 PM
  2. [Trail Care Day] Berm Structures [Sun. 12/28 @ 10am]
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 1
    Last Post: 12-24-2014, 09:31 AM
  3. Illiniwek - Work Days - Sat. 11/15 @ 9am & Sun. 11/16 @ 11am
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 9
    Last Post: 11-16-2014, 10:28 AM
  4. Replies: 2
    Last Post: 07-12-2014, 01:07 PM
  5. Illiniwek Trailwork Extravaganza: Sat. & Sun. 13-14 Oct. @ 9AM
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 26
    Last Post: 10-15-2012, 12:50 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •