Big thanks to everyone that came out to the trail day. We knocked out a bunch of projects today. Multiple areas of erosion were repaired on the green loop and Kickapoo Up and Down, added a berm to Comlara, spruced up the run out on the Sugar Bottom Drop Zone and built up the landing of the Jubilee jump just after the moon tower.