We haven't had much rain for the last two days so the trails are probably dry enough to ride. The trails shed water well and tend to dry quickly. In general, assume 24 hours of trail closure after significant rain at the park until the official open/closed status is put into effect. This will probably be controlled by park staff and posted on a sign at the entrance of the park. For the time being, the rider will have to use their own discretion if the conditions are not suitable to riding.