09/07/10: John, Phil, Dave, Zach, Drew - 10 hrs
Placed bridge and culvert + benching
Total: 226.75 hrs
-
9/14/10 Jessie, Zach, Phil, Drew (1.5 + 0.5 + 0.75 + 2.75) = 5.5 hrs
South side benching
Total: 232.25 hrs
-
9/19/10 John, Zach, Jeff, Cory, Brad, Drew (2+2+3+3+2+3) = 15 hrs
Thats 150 yards less trail to build.
Photos:
Total: 247.25 hrs
-
9/30/10: Dave & Carol, Paul, Jeff, Drew (4 x 2 hrs + 3 hrs) = 11 hrs
Here are some photos of what we were/have been working on.
Total: 258.25 hrs
-
10/03/10 John, Jeff, Zach, Drew (3 + 3.5 + 2.5 + 3.5) = 12.5 hrs
South Loop: Dirtwork
Total: 270.75
-
I didn't post the hours for the last few months of 2010 as well as some of my hours from throughout the year. If there needs to be a more detailed breakdown let me know.
Year total: 480.5 hrs