06.25-26/10: Drew 6.25 hrs
Reroute around large fallen tree on South loop + continued building on South extension

06/27/10: JB, Dennis, Derrick, Drew (4 x 3 hrs) = 12 hrs
Clearing blowdown on the North loop.

Total: 147.75