Results 1 to 4 of 4

Thread: Trail work day??

  1. #1

    Default Trail work day??

    I am thinking of at least trimming around the trails, and possibly reworking some of the 4th St. upper trail, with goal of widening, and strategic drainage. Figured I’d give it attention before Taming the slough race. Thoughts??

    First post, if it goes through!

  2. #2
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,875

    Default

    Get in touch with the Stephens Steward, Bill, by messaging Bill.specht or email stephens@qcforc.org. I think he usually takes care of most trail maintenance with his crew but would probably appreciate more help. Keeping the trail along 4th St. narrow may be a feature to control user speeds so I would definitely talk with him about that before doing any work.
    ⚒ Trails don't build themselves. ⚒

  3. #3
    Join Date
    Jul 2014
    Location
    Moline,IL
    Board Position
    Trail Steward - Stephen's Park
    Posts
    104

    Default

    If you would like to help with string trimming at stephens I have the equipment for that! Dm me for details. Or if you have a string trimmer you can use that. Current Forc membership is required for insurance reasons… correct if I’m wrong. Other than that ,have at it. As for widening and modification of the trail we can chat about that more in depth privately…. Trail design takes drainage into account so things need to be done correctly for the longevity of the trail. And properly designed trails require less maintenance.

    As for what drew said. A really wide trail may lead to excessive speed and negative hiker / bicycle conflict. Best to keep speeds down where possible. That being said it is our responsibility as cyclists to always be in control and yield to all other trail users. Be kind and leave no trace! Anyway sorry for the rant. And trail maintenance volunteers are more than welcome.

  4. #4

    Default

    Thanks for the info! Makes sense to keep it tight, keeps you honest going up and down. ;)

    I should be on the membership roster, I’ll definitely get in touch!

Similar Threads

  1. Stephens park trail work day
    By Bill.specht in forum Stephen's Park [SP]
    Replies: 6
    Last Post: 06-30-2015, 06:56 PM
  2. Trail Work Day This Saturday (9/7) @ 9AM
    By DH001 in forum Westbrook Park [WBP]
    Replies: 3
    Last Post: 09-07-2013, 01:35 AM
  3. Sunday trail work day.
    By Neiprider in forum Sylvan Island [SI]
    Replies: 2
    Last Post: 08-12-2012, 03:05 PM
  4. Trail clean up day - Friday 9/16/11 after work
    By Bexter in forum Sylvan Island [SI]
    Replies: 5
    Last Post: 09-15-2011, 08:28 PM
  5. Trail Work Day: 8/20/09
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 4
    Last Post: 08-20-2009, 02:12 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •