Working on the Illiniwek structures again this Sunday starting @ 9am (meet in the upper south lot). Going to wrap up installing the deck joists for the switch berm, the smaller curved bridge, and boardwalk. This will probably take around 2 hours. If you have an impact driver bring it. I will provide the rest of the tools.
Post up if you can make it.