Results 1 to 4 of 4

Thread: Overlook Trail Completed! Needs Tires...

  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,875

    Default Overlook Trail Completed! Needs Tires...

    Thanks to all who came out and helped build this section of trail over the past months! As the name suggests, the trail passes through the lookout area at the park and additionally will provide great views of the Mississippi River from most points along the trail (especially once the leaves drop).

    It is currently in need of tires to get the trail surface firmed up and should do so quickly thanks to the recent rains. The trail is located in the North System and will be the first offshoot at the top of either climb to the top of the bluff. Until the grass is beaten down, follow the orange pin flags across the lookout clearing to be guided to the remainder of the trail.

    It isn't yet possible to ride onto this trail from the creekside climb if going up the hill because the intersection requires a 180 degree turn in a very small radius. After we complete an upcoming project it should be accessible from all directions.

    I have also updated the trail map to reflect the recent addition (see it here).

  2. #2
    Join Date
    Jul 2011
    Location
    Ogden, Utah
    Posts
    784

    Default

    I have a pair of Captains that are up to the task!

  3. #3
    Join Date
    Feb 2008
    Location
    noitacoL
    Posts
    1,307

    Default

    Awesome, thanks for the hard work!

  4. #4
    Join Date
    Jul 2011
    Location
    Ogden, Utah
    Posts
    784

    Default

    I rode it a few times and it was a good time. Still needs moar tires!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •