06.18.11 Drew 1.5 hrs
SL Extension: Cleanup, deberming, drainage improvements
06.19.11 John, Bryan, Drew (3 x 2 hrs) = 6hrs
Upper NL: Trimming back weeds and face slappers
06.21.11 John, Paul, Bryan, Reed, Drew (2+2+3.5+3+3.5) = 14 hrs
SL: Weed trimming and clearing debris off of trails
SL Extension: fixing wet spots caused by seeping roots and ruts retaining the water
Connector: Lengthened and raised berm near parking lot and Osage orange tree
SLUD2: Built large berm on corner closest to ranger house
06.22.11 John Drew (2+3) = 5 hrs
SL Extension: Debermed trail that was retaining water from seeping roots, widened section near bridge and lengthened smaller berm towards bridge, widened corner on point 4 and constructed all dirt berm from spoils.
06.23.11 Bryan Drew (2x3) = 6 hrs
SL Extension: Constructed berm on lower S-turn section, fixed low rutted out spots where we overfilled glass dump, widened corner on point 1.
06.27.11 John Drew (1+1) = 2 hrs
SL: Removed large oak tree that fell onto trail.
08.10.11 Bryan Drew (2 x 2.5 hrs) = 5 hrs
SLUD2: Constructed berm on tight off camber corner above lower s-turn section.
SL Extension: Removed temporary paving stones for wet spots.
08.12.11 Drew 1.5 hrs
SL Extension: Dirtwork
08.13.11 Drew 2.5 hrs
SL Extension: Dirtwork
08.14.11 Bryan Drew ( 2x 1.5 hrs) = 3 hrs
SL Extension: Dirtwork
08.15.11 Drew 1 hr
South Loop / Connector: Weed trimming
08.23.11 Drew .5 hrs
SLUD2: Dirtwork-insloped corner
08.28.11 Drew 3 hrs
SLUD1: Flagging/surveying
09.06.11 Drew 4 hrs
NLUD1.1: Flagging/surveying.
09.13.11 Drew Brain (2+2) = 4 hrs
NLUD2: Reworking berm on overlook point
09.19.11 Drew Bryan (2.5 x 2) = 5 hrs
NLUD2: Added berm on upper corner of S-turn
09.20.11 Drew Bryan (3+2) = 5 hrs
NLUD2: Constructed two small berms to eliminate front tire washout.
09.27.11 Drew 2 hrs
NLUD1.1: Flagging.
09.28.11 Drew 2.5 hrs
NLUD1.1: Flagging.
09.29.11 Bryan Drew (2 x 2hrs) = 4 hrs
NLUD1.1: Clearing trail (chainsaw work)
10.01.11 Bryan Drew (3.5 + 4) = 7.5 hrs
NLUD1.1: Clearing/brushing/grubbing
10.02.11 “Subway” Brian, Vonda, Bexter, John B., Deb, Dennis, Zach, Paul, Russ, Andy, Mielke, Ray, Bryan, Jordan, Drew (2.25 x 15) = 33.75 hrs
NLUD1.1: Dirtwork & clearing. (~200 yds of trail constructed on 40-60% side slopes)
10.04.11 Bryan Drew (1.5 + 2) = 3.5 hrs
NLUD1.1: Dirtwork
10.06.11 John, Dennis, Bryan, Paul, Drew = 9.5 hrs
NLUD1.1: Dirtwork
10.07.11 Drew 1.5 hrs
SL (Hubbard Rd trail): Clearing large oak tree that fell across trail.
10.11.11 Drew 2.5 hrs
NLUD1.1: Dirtwork
10.12.11 Bryan Drew (2+2.5) = 5.5 hrs
NLUD1.1: Dirtwork
10.13.11 John, Cory, Bryan, Drew = 8.25 hrs
NLUD1.1: Dirtwork
10.16.11 Bryan Drew (3.5 x 2) = 7 hrs
NLUD1.1: Dirtwork
Overlook: Scouting
10.17.11 Drew 2.25 hrs
NLUD1.1: Gathered materials for retaining walls
Overlook: Scouting and flagging.
10.18.11 Drew 3.5 hrs
Overlook: Scouting/trail layout.
10.19.11 Bryan Drew (2 + 2.5) = 4.5 hrs
Overlook: Flagging, clearing fallen tree.
10.20.11 John Russ Drew (1.5+1+2) = 4.5 hrs
Overlook: Clearing, flagging.
10.21.11 Drew Jordan (1.5 + .5) = 2 hrs
Overlook: Flagging.
10.22.11 Drew 1.5 hr
NL: Scouting for reroutes.
10.23.11 Dennis, Scott S., John, Deb, Vonda, Michelle, Paul C., Jake, Andy J., Russ, Chris, Chris’s GF, Drew = 37 hrs
Overlook: Dirtwork
10.27.11 Paul Bryan Drew (2+1+2) = 5 hrs
Overlook: Dirtwork
11.11.11 Drew 1 hrs
NLUD2: Removed fallen tree
SLUD2: Removed fallen tree
11.16.11 Drew .5 hrs
NLUD2: Removed fallen tree
11.21.11 Drew 1 hr
Overlook: Flagging/clearing.
12.17.11 Drew .5 hrs
SLUD2: Clearing fallen tree.
We ended the year with 489.5 volunteer hours logged. Thank you everyone that helped out in 2011!