Planning on working with the berm structures again this Sunday (12/28). Meet in the upper South lot at 10:00 am. Russ and I purchased and hauled a load of 2x6s to the park last weekend to be used for joists. The plan is to finish moving them to the work site and start installing them.
Tools needed: A couple of impact drivers with T25 bits (I have a few spare bits).
Post up if you can make it.