Results 1 to 14 of 14

Thread: Wood Berm Repair & Upgrade Progress

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,853

    Default

    Frame bolts are 3/8" so a little larger bit (7/16") for the holes to take care of any misalignment and 5/16" for the construction lags. If I have time, may pick up some spares just in case. Step-bits would be ideal if you have a set.

    Mesh on all panels has been fully welded and 4 panels need a few brackets welded on. Will get that taken care of tomorrow morning. Otherwise everything is ready to go for install.
    ⚒ Trails don't build themselves. ⚒

  2. #2
    Join Date
    Sep 2022
    Location
    LeClaire Iowa
    Posts
    33

    Default

    Owen and I should be over shortly after 3pm. Would be sooner but schools not out till 2:30.

Similar Threads

  1. [Trail Build Day] Dorrance Feature Building - UR Wood Berm - Sat 12/14 @ 9am
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 1
    Last Post: 12-15-2019, 09:26 PM
  2. [Trail Build Day] Dorrance Feature Building - UR Wood Berm - Sun 12/8 @ 9am
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 0
    Last Post: 12-03-2019, 10:17 PM
  3. [Trail Build Day] Dorrance Feature Building - UR Wood Berm - Sun. 11/24 @ 9am
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 1
    Last Post: 11-25-2019, 07:21 PM
  4. [Trail Build Day] Dorrance Feature Building - UR Wood Berm - Sun. 11/10 @ 9am
    By DH001 in forum Dorrance Forest Preserve [DFP]
    Replies: 0
    Last Post: 11-06-2019, 11:08 PM
  5. Park repair stand
    By Byke Dood in forum Buy & Sell
    Replies: 0
    Last Post: 08-03-2009, 05:16 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •