Results 1 to 25 of 28

Thread: 2009 Illiniwek Trail Maintenance Log

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,853

    Default 7/2/09 Work Day

    John B., Zach, Dennis, Dru_b, Russ, two others whom I don't remember their names, and Drew

    16 hours tonight.

  2. #2
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,853

    Default 7/9/09 Work Day

    Ray, Sorya, John B., Jim G., Russ, New guy, and Drew

    2 hr x 7 = 14 hrs

    Total: 40 hrs

  3. #3
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,853

    Default

    6/26/09: Weed cutting. (2 hrs: Drew)
    6/27/09: Weed cutting, layout. (4.5 hrs: Drew)
    7/13/09: South loop up/down. (5 hrs: John B., Zach, Drew)
    7/16/09: South loop up/down. (9.5 hrs: Ray, Sorya, John, Drew)
    7/14/09: South loop up/down. (2 hrs: Drew)
    7/17/09: South loop up/down. (2.5 hrs: Drew)
    7/22/09: Finished south loop up/down. (7.5 hrs: John, Dave S., Drew)

    Total: 73 hrs

Similar Threads

  1. 2009 Sylvan Island Maintenance Log
    By Bexter in forum Sylvan Island [SI]
    Replies: 13
    Last Post: 08-01-2010, 09:01 AM
  2. 2009 Sunderbruch Maintenance Log
    By nenninma in forum Sunderbruch Park [SBP]
    Replies: 20
    Last Post: 12-06-2009, 12:58 PM
  3. trail maintenance
    By dru_b in forum Sunderbruch Park [SBP]
    Replies: 3
    Last Post: 07-07-2009, 10:35 AM
  4. Weekend Maintenance
    By Rage in forum Sunderbruch Park [SBP]
    Replies: 8
    Last Post: 05-31-2009, 08:52 PM
  5. Replies: 2
    Last Post: 04-27-2009, 11:12 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •