9/1/09: North loop up (Flagging, Clearing) (5 hrs: John, Drew)
9/3-4/09: North loop up (Dirtwork) (5.5 hrs: Drew)
9/5/09: North loop up *Finished* (Dirtwork, Corduroy) (6 hrs: John, Russ, Drew)
9/8/09: North loop Extension (Flagging, Clearing, Dirtwork) (8.25 hrs: John, Russ, Dennis, Drew)

Total: 173.25 hrs