The Illiniwek staff and I were able to get another batch of boards stretched for beam #2 on Thursday. Haven't had any luck tracking down an engine hoist so we're going to build a simple wooden hoist on Saturday (1/7) afternoon at 2pm to get the beam off the form. Will need 2-3 extra people to help move the beam once hoisted.

For Sunday (1/8), I'm planning to do another glue up session if enough people are available. Meeting at 12 pm at the Illiniwek shop and will need 6 more people to get it done. Let me know if you can make it. Epoxy is messy stuff so wear clothes you don't mind getting dirty forever.

Tools we will be using Sunday and could use extras to speed up the work:
- Belt Sander or Power Planer
- Pipe or Bar Clamps
- Drill & Impact Drivers
- 15/16" Socket (For tightening the threaded rod clamps)
- Sawhorses (2 more would be great. Ours are 30" high.)

If you bring tools, write your name on them with a Sharpie or some kind of label so we can get them back to you if they get lost.