Thanks to a local farmer with a huge trailer and skid steer we were able to get the beams moved to Dorrance last Saturday. Next step will be transporting them to the bridge site when the ground refreezes. The beams need to cross a swampy area on the dolly which is fully thawed and really soft right now. They're also green now from applying a wood preservative (copper naphthenate); it should fade to brown over time.