We got the beams installed Saturday in the upright position and bolted on hand rail posts.



Planning the next workday for Wed. evening (3/22) starting at 5:30pm. Meeting/parking in the upper clearing at the top of the fire road again (see this map). Gate will be closed but unlocked if you arrive late (close it behind you). 4-6 people should be plenty for what we need to do. Bring a headlight in case we have to hike out after sunset.

We will be framing the approach ramps, installing bracing between the beams, and cutting/installing decking.

Tools Needed:
  • Wheelbarrows (for hauling equipment to site)
  • Impact Drivers / Drills (corded or cordless)
  • Circular Saw