    Default Upcoming Workdays


    Upcoming Workdays:

    Monday 3/27 @ 4:30 pm
    Tuesday 3/28 @ 4:30 pm (Moving to Tues. due to high chance of rain Mon.)
    • Finish south ramp framing
    • Finish decking (need to haul more to the site)
    • Complete dirt trail to approaches


    Wednesday 3/29 @ 4:30 pm
    • Haul handrail lumber to bridge site
    • Attach handrails
    • Cleanup site


    Tools:
    Will need a few more drill/impact drivers for both days. There will also be a generator on site if you have a corded drill or need to charge batteries.

    ~4 people for each day should be enough. Still parking at the top of the fire road. Same situation with the entrance gate as before.

    Also, the mosquitoes were already swarming last week so bring bug repellent.
    Last edited by DH001; 03-26-2017 at 05:20 PM.

Similar Threads

  1. South Loop Climb Reroute Project (Wood Berms out the Wazoo)
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 25
    Last Post: 05-04-2015, 12:23 PM
  2. [Trail Care Day] Berm Project Work: Sat. (4/11) & Sun. (4/12) @ 9:30 am
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 6
    Last Post: 04-11-2015, 10:42 PM
  3. Illiniwek Trail Project This Week
    By DH001 in forum Illiniwek Forest Preserve [IFP]
    Replies: 5
    Last Post: 08-27-2013, 03:19 PM
  4. Bridge info during Fest
    By Guldy in forum Midwest Mountain Bike Festival
    Replies: 1
    Last Post: 06-21-2012, 06:40 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •