Those who will be helping with the trail build for Caleb on Sun 8/14 9am. I will be texting or messaging you the address of the location later this week. If you plan to be there let me know so I can get you the information.
Here is the tool list...Summary of the work involved (see above post):
90 yds of benching to traverse the ravine slope and get to the bottom.
-Rogue hoes
-flat shovels
-couple wheelbarrows needed.
-Weed Trimmers as we will need to do 90 yds of weed trimming for a loop in a clearing at the bottom of the ravine.
-chainsaw
-Short 5-6 riser timber/dirt stair around a switchback turn (see above).
-powerful corded drill to make holes in the timbers for anchors. Battery drills are not well suited for drilling these holes. Have 1/2" x 16" auger bit.
Installing 12" x 3' culvert and building up trail over a drainage.