John and I were able to get 4 more posts set on the switchberm today. Only 4 more to go for that structure.

The frost line is currently at 4" and growing but we were able to break through the top layer of frozen soil with a little effort and get to the soft stuff.

Still planning on working tomorrow afternoon from 3:30-5ish. We should finish the switchberm posts and be able to move on to the next structure after that.