Thanks to JB, Johnny, Aaron, and Legs for a great day of trail work! We fixed five chronic wet areas with new corduroy, took out some low trees, cut some weeds (more needed this week), and revamped the second creek crossing on LT. Went for a ride there this evening to check out the results; the 2nd crossing on LT is sweet! A little of the same TLC on the first crossing and LT will be dope.

To get ready for MTB101, we'll need to hit the weeds in force, and still have a leaning tree to cut out on Farmdale. Probably Wednesday, we'll figure it out at tomorrow's meeting.

Thanks again!
Rg.