After the last trail day I wanted it give everyone a general update.
The area we worked will be the new northern entrance. Leaving the old entrance through the pines, the south main loop entrance. After going through the pine across the double track, that section will be the exit of the southern loop. Using the DR we were able to mow all of what we had laid out(about 2/3 of the entire loop). Next trail day we will continue laying in trail the surface on both loops. Confusing? don't worry it will all work out. We have had a set back on the 30' bridge but hopefully will work out in the coming weeks.
Right now like most parks SCP is in need of weed eating. I'm going to try and get out there with the DR sometime this week. I'll post up ('cause I know how much you all love weed eating) when I will be out there.