• 7/1/14 - North Loop - John B., Dave W., Drew - 9 hrs - Storm cleanup.
  • 7/2/14- South Loop - John B., Dave W., Dave (from Parkview), Darren, Drew - 14 hrs - Storm cleanup.
  • 7/3/14 - Overlook, South Loop - John B., Drew - 4 hrs -Storm cleanup.
  • 7/8/14 - North Loop, Conector - Drew - 2 hrs - Deadfall cleanup, maintenance.
  • 7/23-24/14 - South Loop: S25 - Drew - 2 hrs - Trail layout.
  • 8/1/14 - N17 - Drew - 3 hrs - Repairing berm on S-turn section.
  • 8/6/14 - N17 - John, Drew - 2 hrs - Berm repair.
  • 8/20/14 - South & North Loop - Drew - 1 hrs - Corridor trimming.
  • 8/22/14 - South Loop S24-S25 - Drew - 1 hrs - Trail layout.
  • 9/7/14 - South Loop S24-S25 - Drew - 2 hrs - Trail layout
  • 9/12/14 - South Loop S24-S25 - Mike H., Drew - 3 hrs - Corridor clearing
  • 9/14/14 - South Loop S24-S25 - John, Vonda, Becky B., Mike (from silvis), Russ, Dave D., Drew, Scott S., Paul S. - 33 hrs - Reroute dirtwork and clearing. Finished 80% of the benchwork.
  • 9/18/14 - South Loop: S24-S25, S20 - John B., Dave W., Russ B., Sergio M., Drew - 10 hrs - Building berms and rollers. Repaired berm on upper south loop in S20
  • 9/28/14 - North Loop; N6 - John B., Dave W., Amie, Fred, Vonda, Josh, Sergio, Drew - 24 hrs - Rebuilt berm, improved drainage on steeper sections of trail by adding small rolling grade dips, deberming in low areas to keep water from pooling
  • 10/1/14 - South Loop; S21 - John, Russ, Drew - 8 hrs - Built short and steep log ride TTF on south loop.
  • 10/2/14 - South Loop; S11-S13 - Sergio, Mike C., Drew - 6 hrs - Added rolling grade dip drains (7) and deberming along the trail which parallels Hubbard Rd.
  • 10/21/14 - South Loop; S24, S3 - Jeff K, Darwin W., Mike C., Dave W., Derrek B., Drew - 11 hrs - Set posts for boardwalk. Spaced at 7.5' on 24" centers, used ~6" black locust posts. 10 posts in total. Also replaced 4 rotted posts on berm near ranger house and replaced dirt which had slumped off.
  • 11/6/14 - South Loop; S24 - Drew - 1 hrs - Trail layout.
  • 11/12/14 - South Loop; S24 - Drew - 2 hrs - Laying out switchberm post locations.
  • 11/13/14 - South Loop; S24 - Drew, John, Russ - 3 hrs - Laying out switchberm post locations.
  • 11/14/14 - South Loop; S24 - Drew, John - 4 hrs - Laying out ground berm post locations and area survey.
  • 11/15/14 - South Loop; S24 - Russ, Sergio, Jon, Becky, Darwin, Dave W., Drew - 23 hrs - Transporting materials, Unloading posts for structures.
  • 11/16/14 - South Loop; S24 - John, Deb, Brandon, Mike, Mike C., Sergio, Bill S., Russ B., Scott S., Dave W., Drew - 48 hrs - Hauled posts to work area, dug post holes for switchberm, set 8 posts.


2014 Total: 365 hrs