    I think there was talk of building a temporary embankment into the channel between the island and IL shore to disassemble the old bridge and install the new one. Something about not being able to use cranes from the IL shore because of the overhead power lines. This is probably part of the reason why they need such a large/expensive environmental study.

    Times Article: http://qctimes.com/news/local/moline...b1ffc2bc9.html