Results 1 to 2 of 2

Thread: 2012 Illiniwek Volunteer Hour Log

  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,850

    Default 2012 Illiniwek Volunteer Hour Log

    01.04.12 John Drew 2 x .5 hrs
    Clearing deadfall on SLUD1 and connector and also removed exposed stumps in trail tread.

    03.14.12 Drew 1 hr
    SLEx: Clearing deadfall.

    03.25.12 (3.25 hrs)
    NL: Flagging reroutes for sustainability improvements

    03.27.12 (3 hrs)
    NL: Flagging reroutes for sustainability improvements

    04.06.12 John, Drew 2 x 2.5 hrs = 5 hrs
    North Loop: Rerouted around tree pass-through, cleaned out drainages, elevated spot where water usually pools and added drains and a collection pit for water to collect in instead of trail, removed small log overs that had been on existing trails for years, removed some honeysuckle bushes from corners on NLUD2 to improve sightlines and minimize future pruning.

    04.18.12 John, Paul, Sergio, Logan, Jeff, Drew 6 x 2 hrs = 12 hrs
    North Loop: Rerouted section of trail on NLEx1.

    04.25.12 John, Drew, Sergio, Jeff, Logan, Eric, Gavin (2x2.5+5x1.5 hrs) = 12.5 hrs
    Overlook: Rerouted segment of trail to allow using portion of overlook stairway trail.

    05.15.12 Drew 2 hrs
    SL: Mowed grassy field, trimmed back encroaching branches on upper south loop.

    05.17.12 John 2.5 hrs
    Weed trimming

    05.18.12 Paul, Sergio, Drew (2+2+3) = 9 hrs
    Overlook: Dirtwork

    05.21.12 John, Drew (2 x 1.5 hrs) = 3 hrs
    NLUD2+ NL: Trimming weeds

    05.23.12 John, Sergio, Tim, Drew (4 x 2.5 hrs) = 10 hrs
    Overlook: Finished and opened section of trail to the north of the scenic overlook.

    05.30.12 John, Sergio, Paul, Mark, Drew (5 x 2 hrs) = 10 hrs
    NL: Rerouted sharp downhill corner at the furthest point on the loop and rehabbed the old trail.

    Thank you everyone who has been available to help!

    74.25 hours

  2. #2
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,850

    Default

    6/6/12 Paul, Sergio, Drew (3 x 2 hrs) = 6 hrs
    North Loop: Reroute to improve trail flow and sustainability.

    Thanks for helping guys!

    80.25 hrs
    Last edited by DH001; 06-06-2012 at 10:50 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •