01.04.12 John Drew 2 x .5 hrs
Clearing deadfall on SLUD1 and connector and also removed exposed stumps in trail tread.

03.14.12 Drew 1 hr
SLEx: Clearing deadfall.

03.25.12 (3.25 hrs)
NL: Flagging reroutes for sustainability improvements

03.27.12 (3 hrs)
NL: Flagging reroutes for sustainability improvements

04.06.12 John, Drew 2 x 2.5 hrs = 5 hrs
North Loop: Rerouted around tree pass-through, cleaned out drainages, elevated spot where water usually pools and added drains and a collection pit for water to collect in instead of trail, removed small log overs that had been on existing trails for years, removed some honeysuckle bushes from corners on NLUD2 to improve sightlines and minimize future pruning.

04.18.12 John, Paul, Sergio, Logan, Jeff, Drew 6 x 2 hrs = 12 hrs
North Loop: Rerouted section of trail on NLEx1.

04.25.12 John, Drew, Sergio, Jeff, Logan, Eric, Gavin (2x2.5+5x1.5 hrs) = 12.5 hrs
Overlook: Rerouted segment of trail to allow using portion of overlook stairway trail.

05.15.12 Drew 2 hrs
SL: Mowed grassy field, trimmed back encroaching branches on upper south loop.

05.17.12 John 2.5 hrs
Weed trimming

05.18.12 Paul, Sergio, Drew (2+2+3) = 9 hrs
Overlook: Dirtwork

05.21.12 John, Drew (2 x 1.5 hrs) = 3 hrs
NLUD2+ NL: Trimming weeds

05.23.12 John, Sergio, Tim, Drew (4 x 2.5 hrs) = 10 hrs
Overlook: Finished and opened section of trail to the north of the scenic overlook.

05.30.12 John, Sergio, Paul, Mark, Drew (5 x 2 hrs) = 10 hrs
NL: Rerouted sharp downhill corner at the furthest point on the loop and rehabbed the old trail.

Thank you everyone who has been available to help!

74.25 hours