05.03.11 John, Paul C., Drew (2+2+5) = 9 hrs
SL Extension: Dirt work.

05.05.11 Drew 3 hrs
SL Extension: Retaining wall/berm construction.
John, Brian, Jeff, Drew (4 x 2.25 hrs) = 7 hrs
SL Extension: Dirt work.

05.07.11 Brian, Drew (2 x 3 hrs) = 6 hrs
SL Extension: Dirt work.

Total: 122 hrs