Results 1 to 9 of 9

Thread: 2011 Sylvan Maintenance log

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Nov 2008
    Location
    Hampton, IL
    Board Position
    Trail Steward - Illiniwek; Web Director
    Posts
    1,853

    Default

    4/9/11: +6 hrs building elevated trail on the northwest end of the island. (If you were there helping remember to post up your hours!)


    Total: 11.5 hrs

  2. #2
    Join Date
    Nov 2008
    Location
    Rock Island
    Board Position
    Trail Steward - Sylvan Island
    Posts
    153

    Default

    Put me down for the same

    FM
    In wine there is wisdom, in beer there is freedom, in water there is bacteria.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •