check out the pics. what fun trail work!
http://www.lambaonline.com/forum/vie...6&p=6781#p6781

the water was probably 8ft at the old location and should be around 2-3ft at the new location

we need to finish bench cutting the trail to the bridge and then all of sugar will be connected again! anyone want to help? the water is still rising...