06.25-26/10: Drew 6.25 hrs
Reroute around large fallen tree on South loop + continued building on South extension
06/27/10: JB, Dennis, Derrick, Drew (4 x 3 hrs) = 12 hrs
Clearing blowdown on the North loop.
Total: 147.75
-
7/1/10: JB, Dennis, Josh, Vonda, Paul C., Drew (2.25 + 2.25 + 2.25 + 2.25 + 1.5 + 2.5) = 13
South Loop Extension: Dirtwork
Total: 160.75 hrs