-
5/8/2010
db,mp,vondable,jb,drew,lee,paul,ag,bmer,steve 3.0hrs x 10 = 30 hrs
work on the 'Tarmac' loop.
Total = 56 hours
-
cutting down trees, retrieving bridge. 3hr
Total = 59hr
Haters gonna hate.
-
6/10 mp,db x 3hrs = 6 (tarmac loop)
6/17 mp,db x 2.5hrs = 5 (tarmac)
6/21 mp,db x 2.5hrs = 5 (tarmac)
6/29 mp,db,jonny s,tim x 3.5hrs = 14 (weed wacking)
7/6 mp,db x 1.5hrs = 3 (tarmac)
7/8 mp,db x 2.5hrs = 5 (tarmac)
= 24hrs
Total = 83 hrs
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules