Rage
11-09-2009, 08:13 PM
Next level for dealing with soggy areas - put in a 'T' drain tile with the cross above the trail and the stem under the corduroy. I found a net "sock" to put over the tile to reduce the need for gravel backfill (who wants to haul a bunch of gravel down LT? Not me!). Water was draining immediately after we set the tile in place. So far, so good!
DruB and Andy J finishing up the new corduroy turn on LT.
http://i253.photobucket.com/albums/hh43/publius1984/DBAJSBP.jpg
If you have any 6" dia. or larger PVC tubes or 4" perforated tile around 10' long or so that you want to get rid of, give a holla, we'll put it to use.
Rg.
DruB and Andy J finishing up the new corduroy turn on LT.
http://i253.photobucket.com/albums/hh43/publius1984/DBAJSBP.jpg
If you have any 6" dia. or larger PVC tubes or 4" perforated tile around 10' long or so that you want to get rid of, give a holla, we'll put it to use.
Rg.